Community Edition Tutorial¶
This cumulative tutorial starts with installation and builds a synthetic paper-industry scenario through Demand and Supply Planning. Follow the training modules in order: each page starts from the result of the previous one and guides the actions and validations needed to continue.
Course map¶
Preparation¶
| # | Training module | Status | Result |
|---|---|---|---|
| 1 | Installation and first login | Available | Community Edition installed and first login completed |
Demand Planning¶
See the overview of this stage.
| # | Training module | Status | Result |
|---|---|---|---|
| 2 | Demand data loading | Available | Units, conversions, materials, locations, characteristics, and Sales loaded and checked |
| 3 | Demand Forecast Overview | Available | Relationship among the execution profile, cluster combinations, and statistical configuration understood |
| 4 | DFU clusters | Available | Two material clusters and Default Location Cluster covering the 12 fallback locations |
| 5 | Demand Planning execution profile | Available | Monthly profile with a 12-period horizon saved |
| 6 | Manual statistical configuration | Available | Two Holt-Winters configurations, top-down distribution, and retrospective December 2026 previews with actual error and both charts validated |
| 7 | Run the Demand Plan | Available | Functional execution, status, and persisted scenario |
| 8 | Configure the commercial collaboration view | Available | User, East scope, key figures, and Save in batch |
| 9 | Collaborate on and adjust the Demand Plan | Available | Increases, decreases, and per-cell reconciliation |
| 10 | Review and export the Demand Plan | Available | Overview and complete XLSX download |
Supply Chain Planning¶
See the overview of this stage.
| # | Training module | Status | Result |
|---|---|---|---|
| 11 | Load production and capacity data | Available | Resources, routing, operations, BOM, and version |
| 12 | Load the supply network | Available | Version, lanes, and material allowlists |
| 13 | Configure the inventory policy | Available | 5-day coverage for 10 finished goods at two DCs |
| 14 | Load initial inventory | Available | Opening snapshot and reconciliation |