Community Edition Tutorial
This walkthrough uses Community 2026.09.22. In this version, reusable calendar profiles define bucket size and horizon; Demand and Supply execution profiles select a calendar by ID.
This cumulative tutorial starts with installation and builds a synthetic paper-industry scenario through Demand and Supply Planning. Follow the training modules in order: each page starts from the result of the previous one and guides the actions and validations needed to continue.
The application uses English control labels. Both languages provide the same original XLSX exports, with Portuguese scenario IDs and configured descriptions. Use those IDs literally when importing files and selecting records in the app. The English text explains the same scenario; it does not rename workbook data.
Course map
Preparation
| # | Training module | Status | Result |
|---|---|---|---|
| 1 | Installation and first login | Available | Community Edition installed and first login completed |
Demand Planning
See the overview of this stage.
| # | Training module | Status | Result |
|---|---|---|---|
| 2 | Demand data loading | Available | Units, conversions, materials, locations, characteristics, and Sales loaded and checked |
| 3 | Demand Forecast Overview | Available | Relationship among the execution profile, cluster combinations, and statistical configuration understood |
| 4 | DFU clusters | Available | Two material clusters and Default Location Cluster covering the 12 fallback locations |
| 5 | Calendar and Demand execution profile | Available | Reusable monthly calendar linked to the Demand profile |
| 6 | Manual statistical configuration | Available | Two Holt-Winters configurations, top-down distribution, and retrospective December 2026 previews with actual error and both charts validated |
| 7 | Run the Demand Plan | Available | Functional execution, status, and persisted scenario |
| 8 | Configure the commercial collaboration view | Available | User, Central scope, key figures, and Save in batch |
| 9 | Collaborate on and adjust the Demand Plan | Available | Increases, decreases, and per-cell reconciliation |
| 10 | Review and export the Demand Plan | Available | Overview and complete XLSX download |
Supply Chain Planning
See the overview of this stage.
| # | Training module | Status | Result |
|---|---|---|---|
| 11 | Load production and capacity data | Available | Resources, routing, operations, BOM, and version |
| 12 | Load the supply network | Available | Version, lanes, and material allowlists |
| 13 | Configure the inventory policy | Available | 5-day coverage for 10 finished goods at two DCs |
| 14 | Load initial inventory | Available | Opening snapshot and reconciliation |
| 15 | Configure the Supply execution profile | Available | Monthly calendar, heuristic, policy, capacity, and opening stock linked |
| 16 | Run the Supply Plan | Available | Integrated run completed and persisted with the expected references |
| 17 | Open, analyze, and export the Supply Plan | Available | Planning Book review, bottleneck drilldown, and four result extracts |
| 18 | Analyze the results in a worked example | Available | Reconcile the validated Plan 6, five native XLSX extracts, capacity and stock |
| 18 | Analyze the results in a worked example | Available | Reconcile the validated Plan 6, five native XLSX extracts, capacity and stock |