SAP reference for production costs¶
This page complements production costs. The analogy is partial: OpsFactor costs are explicit, effective-dated decision inputs, while SAP costs can result from Controlling and product costing.
| OpsFactor | Nearby SAP sources | Common tables | Transactions |
|---|---|---|---|
productionResourceId cost |
work center, cost center, and activity prices | CRHD, CRCO, CO data |
CR03, KP26 |
routingId cost |
operation standard values and product costing | PLPO, KEKO, CKIS |
CA03, CK11N, CK13N |
| shift cost by resource | capacity/shift and derived rate | capacity configuration and CO | CR03, KP26 |
Use the same composite IDs as the resources and routings
page, for example 1000-LINE-01 and 50001234-01. Date, currency, unit, and
cost frequency must be materialized by the transformation.
Do not treat an actual posted cost as a planning cost without a functional rule. An SAP shift is also not guaranteed to match an OpsFactor shift definition directly.
Return to production costs or the SAP index.